Views
227
Replies
3
Status
Closed
In PS Elements 4.0, is it possible to change the order of the pictures I bring into an HTML Photo Gallery project? It orders them oldest to newest by default. I could manually drag them around to change the order but I have many pictures and that would take a long time. I was looking for a sort command on the pictures in the photo gallery project but didn’t see one. Is there such an option?
Must-have mockup pack for every graphic designer 🔥🔥🔥
Easy-to-use drag-n-drop Photoshop scene creator with more than 2800 items.